OK, I know the concept is "don't lay the first tile until you know where the last one will end up", so when I've worked out all the measurements to make sure there will be no slivers of tile, are these the correct first steps (I'm starting to tile over a bath):
(After wall prep/tanking etc)
Thanks
(After wall prep/tanking etc)
- Measure up from lip of bath 3mm (for sealant gap) + height of tile + 3mm (for spacer)
- Attach a wood batten there and make sure it's dead level
- lay first row of tiles along this batten
- tile up to ceiling (I have no borders)
- wait for adhesive to set and carefully remove batten
- tile last row along top edge of bath
- wait for adhesive on that row to set, then grout