S
skel
Hi,
I've been reading everything here on tanking which is very useful. however, do the same rules apply to a tiled shower which will also be used as a bath, ie have 200 litres of water sat there for an hour?
I've been talked into making this for a client in a 1st floor appartment with a joist/wood floor.
-The slate tiles can be cut to size for our convenience
-I have prepped in grp in the past
-Didn't want to use weighty concrete, would prefer plywood frame
I have looked for info or examples, but it seems as though people use premade tubs or cast them in concrete. I need to move on this soon as the job is well under way, so any help/links/stories at all would be much appreciated.
Skel :48:
I've been reading everything here on tanking which is very useful. however, do the same rules apply to a tiled shower which will also be used as a bath, ie have 200 litres of water sat there for an hour?
I've been talked into making this for a client in a 1st floor appartment with a joist/wood floor.
-The slate tiles can be cut to size for our convenience
-I have prepped in grp in the past
-Didn't want to use weighty concrete, would prefer plywood frame
I have looked for info or examples, but it seems as though people use premade tubs or cast them in concrete. I need to move on this soon as the job is well under way, so any help/links/stories at all would be much appreciated.
Skel :48: