Just read through all the replies, looks like I,m stuck with this, but...... If the tiler laid these incorrectly, even if it,s 2 years, can I get his insurance to pay for the fix ? Or if t turns out to be the floor , I,m going to raise with the kitchen team, and see if they should fx, is this approach reasonable ?
If I have to lift the whole floor, I estimate ths at about 5K , far too much fr me, surely the tiler r te kitchen team , should be responsible and have to sort out , or a, I dreaming ?