Minor works but not a minor works?

  • Thread starter Thread starter diditrain
  • Start date Start date
  • Tags Tags
    not

Tilers Forums Official Sponsors

When connecting a new boiler into an existing switch fused connection unit and you are not modifying or extending any of the fixed circuit wiring, do you carry out the full range of tests shown on the minor works cert, with reference to a NICEIC version?
Zs @ db
R1R2 of the circuit up to the switch fuse
I/R test of the circuit before connecting the boiler
I/R test of the circuit when the boiler has been connected at a lower test voltage 250
Or would you just do a zs @ boiler and RCD tests etc?

Continue reading...
 

Advertisement

Thread Information

Title
Minor works but not a minor works?
Prefix
N/A
Forum
Electrical Advice
Start date
Last reply date
Replies
0

Thread Tags

Tags Tags
not

Advertisement

UK Tiling Forum

Thread statistics

Created
diditrain,
Replies
0
Views
10

Thread statistics

Created
diditrain,
Replies
0
Views
10

Weekly Email Digest

Back