I just realised that if I site the manifold in the 'cloaks' cupboard the amount of ufh pipes in the hall outside the cupboard will mean I would not be able to pipe that area as a zone?
In this case do I simply use the amount of pipes going to other zones in the hall to heat it?
I had initially thought to use radiators upstairs but is it feasible to wet ufh on top of a chipboard sub floor? I have seen insulation panels with the pipe route pre cut into them, does this stuff work well and who makes it?