P
penno
I doubt I would get that down in a day as the UTH is not running over the whole area and the levels aren't great in some places so it will be slower than over a level scread by quite a bit for me at least. Quite a bit of cutting required in some places especially in long Kitchen leading through doorway into utility and also going down seperate corridor into shower room. I reckon more like 7 metres a day on average maybe 10 on the good runs and less around the kitchen. A bit akward as I had already done 3 bathrooms/shower rooms for him at a decent price so I priced floor at £1300. I thought that was very cheap and would normally have went for around £1800.
To knock £550 off your price because you have done work for him before is way too much.
That is almost a third of a discount, far too cheap.