Hi all
Been to look at a job a builder is prepping for tiling
Cement based screed with wet ufh
They have set a impey tray in and plan to install impey guard
Matting to floor area
Are there any possible issues with temperature of the ufh
Not sure of the max
Thanks
Been to look at a job a builder is prepping for tiling
Cement based screed with wet ufh
They have set a impey tray in and plan to install impey guard
Matting to floor area
Are there any possible issues with temperature of the ufh
Not sure of the max
Thanks