G
geraldine
Just finished my first tiling job: 7 square meters on 2 walls in a kitchen with two recessed windows, one of which is 2.30m long, the other 1.20m and 19 square meters of floor. There was quite a bit of cutting. Because it is my first job, it took me ages so didn't charge by the hour but by the square meter at £xx/square meter. Is that reasonable? :huh2: Everyone seems to think I did a good job but I am having a crisis of conscience...
Last edited by a moderator: