Hi All
Have ripped out tiles from a bathroom i'm hoping to start on wednesday.
In some areas mainly around the window the tile has pulled off the plaster back to the brick so need to build back up to around 15/20mm.
If i use bonding coat/skim that i beleive would take at least 3 weeks to dry.
Could i build up using rapid set.one coat about 8mm then a second?
If so how long between coats and could i then tile within 2/3 days?
Or could another option be to cut the plaster into a rectangle shape then use rapid set to dot/dab plasterboard on to build up.
Cheers for any thoughts
Kev
Have ripped out tiles from a bathroom i'm hoping to start on wednesday.
In some areas mainly around the window the tile has pulled off the plaster back to the brick so need to build back up to around 15/20mm.
If i use bonding coat/skim that i beleive would take at least 3 weeks to dry.
Could i build up using rapid set.one coat about 8mm then a second?
If so how long between coats and could i then tile within 2/3 days?
Or could another option be to cut the plaster into a rectangle shape then use rapid set to dot/dab plasterboard on to build up.
Cheers for any thoughts
Kev