I have to quote for the worst case scenario so thinking around 10 days.
As Martyn above said it took him 1 day to lift 3m2 of 6mm ply this is 90m2 and a 12/15mm ply I also wonder about the possibility of the floor boards been pulled off the joists when levering up the floor.
Know idea how previously well it was put down.