Hi all,
We had an outdoor limestone patio laid at the start of June (finished circa 07/06/24). We are yet to grout it. I'd like to seal it before doing so and I have bought Lithofin Stain stop. I have read a lot regarding its application however I have received conflicting information about when it is best to do so. I have been told that waiting to seal it doesn't matter/ we need to wait 13 weeks/ we need to wait a year to let it effloresce etc.
What is the general consensus regarding this?
Additionally, how long does it need to be completely dry before sealing it? Again I have read that 3 days is necessary but that's impossible at the moment with all of this rain!!
Thanks in advance
We had an outdoor limestone patio laid at the start of June (finished circa 07/06/24). We are yet to grout it. I'd like to seal it before doing so and I have bought Lithofin Stain stop. I have read a lot regarding its application however I have received conflicting information about when it is best to do so. I have been told that waiting to seal it doesn't matter/ we need to wait 13 weeks/ we need to wait a year to let it effloresce etc.
What is the general consensus regarding this?
Additionally, how long does it need to be completely dry before sealing it? Again I have read that 3 days is necessary but that's impossible at the moment with all of this rain!!
Thanks in advance