wysinawyg
Right gents, hoping you all can help. We're having our kitchen re-done and as part of that we're keen to put in some electric UFH. People aren't keen on doing the UFH so it looks like muggins is going to have a go.
So I'll be working with a cleaned off concrete floors which would otherwise be ready to tile onto. A few questions then:
1. intention isn't to tile under units, just under freestanding appliances. Should I be putting insulation boards under the units though or just getting them to crank up the cabinet legs to give more headroom?
2. if I don't put insulation board over the whole thing how do I do SLC over just the relevant bits? I assume the norm would be for the cabs to go in first and then to board and tile up to the legs, but how do I stop the SLC running over the edges? or should it be stiff enough not to?
3. I've got to cover about 25sqm in as short a time as possible, hints and tips?
So I'll be working with a cleaned off concrete floors which would otherwise be ready to tile onto. A few questions then:
1. intention isn't to tile under units, just under freestanding appliances. Should I be putting insulation boards under the units though or just getting them to crank up the cabinet legs to give more headroom?
2. if I don't put insulation board over the whole thing how do I do SLC over just the relevant bits? I assume the norm would be for the cabs to go in first and then to board and tile up to the legs, but how do I stop the SLC running over the edges? or should it be stiff enough not to?
3. I've got to cover about 25sqm in as short a time as possible, hints and tips?