This week.( what you up to )

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Not a lot this wk, MOT on Mon, dentist on Tues, a VERY little splashback, and just a couple of bits for my mother-in-law


Going into a bathroom tomorrow hopefully all nicely plastered so I can install and tile in four days. I want friday off so I can visit the harrowgate tool fair. Only karndean on the floor so I might do it (I get someone else to do the floor, hopefully on friday!)

I've just pre-registered for the tool fair in coventry in september :thumbsup:
 
Monday I’m back on the rip out job Tuesday I have a 40m conservatory floor in 600 by 600 trav Thursday back at the rip out and I have a 70m hotel floor for the weekend.
 
Nice little bathroom to finish off tomorrow, just 63 cuts left it think? then lay wood floor (yuk) and grout Tuesday, refit sanitary ware and clear up go home for rest of the week off.

Thats the plan but i guess the reality will be different....:mad2:
 
40 mtrs 600x600 jura limestone to lay in lift lobby and landing . rip up existing floor and screed about 70 ml deep using ardex 35 mix.:thumbsup:
 
Not much this week, lack of work getting a bit desparate, just repairs to a kitchen floor after new units fitted, and maintain 53m2 of Travertine unfilled/filled with fresh sealer. Then no work booked in until 22nd March:yikes:, which is when I start 43m2 tumbled marble on durabase, very much looking forward to that one, it's in the Bella Opus design, will start getting some pics up for the gallery soon.(come on I've only just got my avatar sorted!)

Ken
 
No mate not at all, I love tiling! I just thought the way things are I'm probably best to do my tiling and build my tools, Customer base and gain more experience around a full time job untill I can justify going at it full time (which I hope will be sooner rather than later). I have been trying the last few months to go it alone but with no money at all to advertise it's a bit of a silly idea.


quite rite mate,good luck!:thumbsup:
 
Got a travertine kitchen to finish tomorrow, then Wednesday and Thursday doing a small bathroom. Friday, will start prepping a wet room to start on Monday.

Glad to see most are keeping busy. :thumbsup:
 
hi im doing 30sm slate floors and 55sm bumpy whites with glass mosaic then get it all grouted , ready for a 25 sm bathroom on sat sunday
 
29 m2 600mm porcelain floor in a kitchen/sun room should be finished thurs looking forward to fri off!:8:
 
Finished the last of 3 bathrooms in whalley range, on tuesday. Started a new bathroom in macclesfield today, and measured up for a full ensuite ripout on my way home. BUSY BUSY BUSY. Hope it keeps up. :thumbsup:
 
No mate not at all, I love tiling! I just thought the way things are I'm probably best to do my tiling and build my tools, Customer base and gain more experience around a full time job untill I can justify going at it full time (which I hope will be sooner rather than later). I have been trying the last few months to go it alone but with no money at all to advertise it's a bit of a silly idea

Good luck Mark:thumbsup:What happened with your interview?
 
Im up to my eye balls! 130m2 600 square polished porcelain.25m2 mosaic wet room.37m2 travertine bathroom with 4 size pattern walls and floor! Ouch again.all this in 1 house.about 10 more jobs booked in.pressure.
 

Advertisement

Thread Information

Title
This week.( what you up to )
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
47

Thread Tags

Advertisement

Tilers Forums Official Sponsors

Thread statistics

Created
DHTiling,
Last reply from
hillhead,
Replies
47
Views
4,000

Thread statistics

Created
DHTiling,
Last reply from
hillhead,
Replies
47
Views
4,000
Back