Not a lot this wk, MOT on Mon, dentist on Tues, a VERY little splashback, and just a couple of bits for my mother-in-law


Going into a bathroom tomorrow hopefully all nicely plastered so I can install and tile in four days. I want friday off so I can visit the harrowgate tool fair. Only karndean on the floor so I might do it (I get someone else to do the floor, hopefully on friday!)

I've just pre-registered for the tool fair in coventry in september :thumbsup:
 
Monday I’m back on the rip out job Tuesday I have a 40m conservatory floor in 600 by 600 trav Thursday back at the rip out and I have a 70m hotel floor for the weekend.
 
Nice little bathroom to finish off tomorrow, just 63 cuts left it think? then lay wood floor (yuk) and grout Tuesday, refit sanitary ware and clear up go home for rest of the week off.

Thats the plan but i guess the reality will be different....:mad2:
 
40 mtrs 600x600 jura limestone to lay in lift lobby and landing . rip up existing floor and screed about 70 ml deep using ardex 35 mix.:thumbsup:
 
Not much this week, lack of work getting a bit desparate, just repairs to a kitchen floor after new units fitted, and maintain 53m2 of Travertine unfilled/filled with fresh sealer. Then no work booked in until 22nd March:yikes:, which is when I start 43m2 tumbled marble on durabase, very much looking forward to that one, it's in the Bella Opus design, will start getting some pics up for the gallery soon.(come on I've only just got my avatar sorted!)

Ken
 
No mate not at all, I love tiling! I just thought the way things are I'm probably best to do my tiling and build my tools, Customer base and gain more experience around a full time job untill I can justify going at it full time (which I hope will be sooner rather than later). I have been trying the last few months to go it alone but with no money at all to advertise it's a bit of a silly idea.


quite rite mate,good luck!:thumbsup:
 
Got a travertine kitchen to finish tomorrow, then Wednesday and Thursday doing a small bathroom. Friday, will start prepping a wet room to start on Monday.

Glad to see most are keeping busy. :thumbsup:
 
hi im doing 30sm slate floors and 55sm bumpy whites with glass mosaic then get it all grouted , ready for a 25 sm bathroom on sat sunday
 