If you are lifting and replacing the flooring, you can level the floor by fixing timber fillets onto the joists. ( tapering timber pieces, to bring floor to level ,before re-laying flooring).another issue is that the tiles slope downwards as they approach the front door!
how would i straighten this? is screed the correct material?
Thank you!
You say that you have damp , half way up walls. Also worth checking the condition of the over site, (is it sealed). What is the sub floor ventilation like?. Do you have issues of sub-floor condensation. Closely inspect joist ends where close to damp external walls.