M
Mr T
You didnt mention the floor being primed... Maybe thats the reason the adhesive wasnt stuck to the floor?
The floor was primed, I saw it done. Given two coats according to the tiler.You didnt mention the floor being primed... Maybe thats the reason the adhesive wasnt stuck to the floor?
The floor was primed, I saw it done. Given two coats according to the tiler.
However, the tiles were laid when the primer was still tacky, is that right ?
I have had him back twice and he is back tomorrow to strip out the tiles and do a temporary (as that is all it will be) repair in one of the other properties. He is not sure what the problem is, he has mentioned wrong adhesive supplied and the supplier reckons there has not been enough adhesive used.Most tile adhesives (cement based ) do state no primer ... this might explain the lack of bonding ... but still does not make the installation of tiling direct to chipboard correct ..
Have you called the tiler back Ian.. ?
Was the heating banged straight up to it's highest heat or was it turned up gradually.....