Yes, coverage was good and so far its been a few weeks and all is well. Lets hope they last the test of time (and wife/kids dropping stuff)
They look amazing and 0 lippage. Although the floor is not 100% flat (it follows the timbers curve) you cant tell coz there is not lippage
Thanks for the help
Now im onto the next part. The pre-exisiting slab and waterproofed bathroom, so of course here come the questions lol
1) On the slab is it sufficient to use something like bondcrete as it is a steel float finish and than lay a sand
cement bed? I was thinking 40mm bed
2) 4:1 mix of sand and
cement? also do i use mesh to re-inforce it?
3) On the waterproofing do i have to add anything to the floor before i put the bed down? primer? anything?
also am i ok in laying the bed down, waiting for it to cure than use a
tile adhesive on top or should it be done as the beds getting you set them in the bed? Id rather do it the first way as its easier me with regards to time (1 man job most the time)
Thanks
EDIT: Any idea on how much stuff to order? the complete area is 7m x 5m that needs the screed to be done. how would i work this out?