I
Italy
an apprentice takes 2 kicks in the a.s 🙂@antonio - What is the rates in Italy for an Apprentice?
an apprentice takes 2 kicks in the a.s 🙂@antonio - What is the rates in Italy for an Apprentice?
How much do tilers earn a year in your country ? Is a day rate 200€ or more or less ?I was just wondering if the days in the UK are 24 hours
as all over the world
or 12 hours.
because something is wrong.
or they are not capable of doing the calculations I 🙂
I disagree, don't think you can lay 15sq.m every day, including grouting. Only if you have large floor, you can do 15sq.m .( then lower rates per sq.m)5-7sq.m average.This is the thing about this topic that I can’t get my head around. I’m sure I’m not on my own in this thought but I go to work everyday with a view to earning as much as I possibly can and obviously without compromise on quality because in the long run that would decimate me.
From what I can gather by all the above posts were talking about standard tiling as a base line of say £35/40ish m2 and a day rate of £175/200ish m2. What’s that all about??
On an average day with standard say 600 porc which is what I’m using as a base line, how can you not be fitting say 15m2 per day? Which would equate to £525/600 per day yet many in here are happy to work for £175/200 per day! doesn't make sense to me! Even if you were a lazy so and so and only laid 10m2 it still doesn’t make sense. I get prep etc being a day rate but I read from this that some don’t mind doing average tiling on a day rate? Wtf!
♂️ shockingThis is a £36 per SMView attachment 107216
On a large floor with standard 600’s I’d consider it a poor days work if I only laid 15m2 and some days for sure all I can get done in a crappy bathroom with niches etc is 5m2 hence the word average unless we’re strictly talking about bathrooms🙄I disagree, don't think you can lay 15sq.m every day, including grouting. Only if you have large floor, you can do 15sq.m .( then lower rates per sq.m)5-7sq.m average.
At the moment I'm tiling large swimming pool. Did 100sq.m floor in 6 days including grouting. Walls, steps, tricky top edges, cutting around lights ect. around 8sq.m a day.On a large floor with standard 600’s I’d consider it a poor days work if I only laid 15m2 and some days for sure all I can get done in a crappy bathroom with niches etc is 5m2 hence the word average unless we’re strictly talking about bathrooms🙄
I don't answer because the variables are many,How much do tilers earn a year in your country ? Is a day rate 200€ or more or less ?
other concerns are:I don't answer because the variables are many,
only the difference between north and south is almost 50%.
if I move to the center of my country 10km, I can take 25% more, if I do 40km and I come to Milan, I can earn 50% more.
at the end of the year what matters is what remains,
and how much you billed nothing else.
and this thread is a crazy s.it, the differences are enormous,
no one specifies what and how these prices are quantified,
what is included in the price, I just say that as we are used to
here just doing the work without any material,
more than half of you would always be out of work.
ps. here only counts how much you bill per year,
if you go over a certain amount you earn more if you stay at home.
I don't answer because the variables are many,
only the difference between north and south is almost 50%.
if I move to the center of my country 10km, I can take 25% more, if I do 40km and I come to Milan, I can earn 50% more.
at the end of the year what matters is what remains,
and how much you billed nothing else.
and this thread is a crazy s.it, the differences are enormous,
no one specifies what and how these prices are quantified,
what is included in the price, I just say that as we are used to
here just doing the work without any material,
more than half of you would always be out of work.
ps. here only counts how much you bill per year,
if you go over a certain amount you earn more if you stay at home.
Post automatically merged:
other concerns are:
who gives you the job?
private customers or tile stores?
the difference is enormous, if I have to do 5 trips just to see the work
and then to take the money, I can also charge € 50 per sqm.
and you always have half-empty days while you wait for them to prepare your work. a mountain of andysday.
my job is 80% for tile shops and I almost never have
days andysday. I arrive at the construction site and I already have tiles
and adhesive on the floor to do
when I'm done, I call and they come to clean, if there are no products
I call and they arrive at the place, I just have to knead the adhesive and lay anything else.
is it not the same old same though lee, day rate its a nice easy day, price work its all about earning the money.This is the thing about this topic that I can’t get my head around. I’m sure I’m not on my own in this thought but I go to work everyday with a view to earning as much as I possibly can and obviously without compromise on quality because in the long run that would decimate me.
From what I can gather by all the above posts were talking about standard tiling as a base line of say £35/40ish m2 and a day rate of £175/200ish m2. What’s that all about??
On an average day with standard say 600 porc which is what I’m using as a base line, how can you not be fitting say 15m2 per day? Which would equate to £525/600 per day yet many in here are happy to work for £175/200 per day! doesn't make sense to me! Even if you were a lazy so and so and only laid 10m2 it still doesn’t make sense. I get prep etc being a day rate but I read from this that some don’t mind doing average tiling on a day rate? Wtf!