I would get the tile up and prime the bitumen underneath with rapid flexible and sbr mixed together to form a paste.I use a brush to cut in and the flat side of a large floor trowel to spread out the slurry mix.(paste)Also get hold of a fan or two to direct airflow onto primer to aid with the drying time :smilewinkgrin: