R
Rolandk
Hi,
I've got a really rough, unlevel concrete floor which I want to lay UFH cable on and then cover with Mapei Renovation screed before tiling. Can I use a layer of the screed to level and smooth the floor first and then another layer on top over the cable. Will the two layersof screed bond together OK?
Cheers,
Roland
I've got a really rough, unlevel concrete floor which I want to lay UFH cable on and then cover with Mapei Renovation screed before tiling. Can I use a layer of the screed to level and smooth the floor first and then another layer on top over the cable. Will the two layersof screed bond together OK?
Cheers,
Roland