Hi,
The floor I'm working on is in a bad state, in some parts needs 50mm of screed, so I've put down one layer of ultraplan to bring it up a bit (since its max depth is 30mm and at the time I did not have enough to complete the job) and have left it for 1 week. This was over an old pitted concrete floor, primed with Eco Prim T (1:1 dilution as per Mapei's spec).
So far it seems to have bonded very well to the old surface.
I'm nearly ready to throw the final layer on, my question is do I need to prime ontop of that 1st layer of ultraplan?
Also should I give the unscreeded parts another treatment of Prim T before I put the final layer on?
The floor has had some light foot traffic since the first priming.
Thanks,
Stu.
The floor I'm working on is in a bad state, in some parts needs 50mm of screed, so I've put down one layer of ultraplan to bring it up a bit (since its max depth is 30mm and at the time I did not have enough to complete the job) and have left it for 1 week. This was over an old pitted concrete floor, primed with Eco Prim T (1:1 dilution as per Mapei's spec).
So far it seems to have bonded very well to the old surface.
I'm nearly ready to throw the final layer on, my question is do I need to prime ontop of that 1st layer of ultraplan?
Also should I give the unscreeded parts another treatment of Prim T before I put the final layer on?
The floor has had some light foot traffic since the first priming.
Thanks,
Stu.
Last edited by a moderator: