Hi 1 How long does the screed need to dry out . It has been laid onto a wet pipe system?
2 Does the heating system need to be "fired up" before tiles are laid?
3Can Hardibacker be used on top of a ply floor that has a piped underfloor heating system underneath?
4Can a 2mm grout joint be used on 600x600 porcelain floor tiles?