Got to drain down end of week for final fix of toilet rad, will see if they want it turning round. Was a big dint in the bottom (top bar) so maybe this is the reason.
Very nice job mate, one to be proud of and it's all the planning that goes in to these sort of bathrooms that really show in the end detail.
Top class
Only thing i'm not keen on is the towel rail and that's not because it's upside down but just because it's a standard jobbie, would have liked to have seen a designer rad in there but then again you say it's the same one that came out so not a lot you can do.
Rip out, first fix and reboarded with Aquapanel.
Rad tails replaced with chrome. Basin to be retro-fitted as per bathroom. Toilet feed was surface mounted
in the corner with big stop tap. For neater job and avoid boxing in pipe work altered for the unusual back feed to new toilet:
Imperial pipe. No space to cut in ideal place so double backed through joist.