Water mains earthing

  • Thread starter Thread starter hooj1981
  • Start date Start date

Tilers Forums Official Sponsors

Hi.

Currently my water supply is via a lead pipe which has an earth fixing point (boxed in so is inaccessible) just above the stop ****.
I plan to relocate where the mains water enters the house, and will be using a Philmac Universal Transition Coupling to join the existing lead pipe to new copper. This joint will be inside the house floor plan but beneath the floorboards.

Given the UTC is plastic am I ok to leave the existing earth in place or do I need to run a new earth to the block which is terminated onto the lead pipe before the UTC?

Thanks

Continue reading...
 

Advertisement

Thread Information

Title
Water mains earthing
Prefix
N/A
Forum
Electrical Advice
Start date
Last reply date
Replies
0

Thread Tags

Tags Tags
None

Advertisement

UK Tiling Forum

Thread statistics

Created
hooj1981,
Replies
0
Views
37

Thread statistics

Created
hooj1981,
Replies
0
Views
37
Back