Too easy,
Conduct onsite saftey inspection
Have a walk thru with the customer , comfirm tile placement.
Grab the delivery docket for the tiles and check amounts and that all codes match.
Use a 2 metre straight edge to check wall floor flatness/recify if needed
Measure and comfirm falls to wastes rectify if needed
Check for other potential problems, arc thickness doorways/ bathtub overhang etc.
Cut around door jams.
Grab laser /level /chalkline and setout.
Load 4 boxes of tile onto trolley and wheel to start point of job.
Setup grinder and cutter and mixer.
mix adhesive and tile.
Conduct onsite saftey inspection
Have a walk thru with the customer , comfirm tile placement.
Grab the delivery docket for the tiles and check amounts and that all codes match.
Use a 2 metre straight edge to check wall floor flatness/recify if needed
Measure and comfirm falls to wastes rectify if needed
Check for other potential problems, arc thickness doorways/ bathtub overhang etc.
Cut around door jams.
Grab laser /level /chalkline and setout.
Load 4 boxes of tile onto trolley and wheel to start point of job.
Setup grinder and cutter and mixer.
mix adhesive and tile.