T
tysfoot
Dont worry, there wont be another disaster like that, the pipe incident wasnt my fault really as the guy was doing the job for was a joiner so he knows his stuff so he just said tack the boards down with the material i get you, never told me about the water pipes so he took full responsibility and i got paid full price for the job.
As far as tiling so work has been excellent, ive had good feedback from every job ive done so far and ive had a few recommendations from most of them
----
as for the 55 sm i start on tuesday, walls have been plastered and i dont see a problem with fixings
As far as tiling so work has been excellent, ive had good feedback from every job ive done so far and ive had a few recommendations from most of them
----
as for the 55 sm i start on tuesday, walls have been plastered and i dont see a problem with fixings
Last edited by a moderator: