....do you consider contract tilers..tilers ?
Stripping out an ensuite today and here is what I find....6mm ply screwed to floor...tiles not back buttered...7 years old..on new build by contractors...wall tiles tiled on paint..floor very bouncy as its those horrid i beam shuttering ply joists..other bathrooms showing cracked grout and one tile in corner was cracked.
is it laziness...cost...piece work or just the norm on sites ?
Stripping out an ensuite today and here is what I find....6mm ply screwed to floor...tiles not back buttered...7 years old..on new build by contractors...wall tiles tiled on paint..floor very bouncy as its those horrid i beam shuttering ply joists..other bathrooms showing cracked grout and one tile in corner was cracked.
is it laziness...cost...piece work or just the norm on sites ?