jonnyc
Picking up from deanos thread about fast tiling , I would like to set out my stance on costing jobs.
I have had a tiling/stone fixing business for 28 odd years.
i have never given a day rate for a single fixing job in that time.
the only time i have given a day rate is when i am asked to dig up an existing floor and make good. this a complete unknown
there have been numerous times when i am presented with a new product albeit stone /mosaic or porcelain and it gets more complicated every year .
but if my company is to be believed as a top fixer company then i should be able to adapt.
if you have to give a day rate you are simply not up to the job.
the only job i have not quoted for to date is a flying stone staircase but i have now seen a so called pro make a balls up and it is really easy if you think about it.
as we get older we lose the balls we had for a job i think but to suggest to a client that you have to charge a day rate for proposed work only suggests that you are not experienced enough to take job on.
you may suggest that the walls were not good for laying mosaics and how could you know what you were going to recieve . well if you have worked for the contractor before you know well what you need to do.
regarding adhesive we solid bed stone or porcelain and if i allow 2.25 sq mts per 20 kg bag tilemaster staeflex there are no surprises.
quite possible that when my clients should they so wish work out how much labour has cost a day they get a shock but in their world they know that they have have got a good job for a fraction of a the hourly rate they may charge in their own profession.
i dont think i have ever lost a client because of cost but i have saved myself so much grief by not charging a day rate .
I have had a tiling/stone fixing business for 28 odd years.
i have never given a day rate for a single fixing job in that time.
the only time i have given a day rate is when i am asked to dig up an existing floor and make good. this a complete unknown
there have been numerous times when i am presented with a new product albeit stone /mosaic or porcelain and it gets more complicated every year .
but if my company is to be believed as a top fixer company then i should be able to adapt.
if you have to give a day rate you are simply not up to the job.
the only job i have not quoted for to date is a flying stone staircase but i have now seen a so called pro make a balls up and it is really easy if you think about it.
as we get older we lose the balls we had for a job i think but to suggest to a client that you have to charge a day rate for proposed work only suggests that you are not experienced enough to take job on.
you may suggest that the walls were not good for laying mosaics and how could you know what you were going to recieve . well if you have worked for the contractor before you know well what you need to do.
regarding adhesive we solid bed stone or porcelain and if i allow 2.25 sq mts per 20 kg bag tilemaster staeflex there are no surprises.
quite possible that when my clients should they so wish work out how much labour has cost a day they get a shock but in their world they know that they have have got a good job for a fraction of a the hourly rate they may charge in their own profession.
i dont think i have ever lost a client because of cost but i have saved myself so much grief by not charging a day rate .