J
jonnyc
peterInteresting point. If you don't mind me asking, what's your method? I suppose with different thickness it's not in your interest to use a standard notch.
Do you pour a continuous bed and beat to the same level?
just lay down a bed however you like and then work the tile or stone in to it till you can see you havea full bed and level tile. usually tell by seeing the adhesive coming out of sides but you know from experience really.
ive had an adhesive rep round couple of times when had problems with floors cracking and we have taken tiles up for him. explained what we did and they had no problem how you bed tile as long as you get enough coverage