D
Dumbo
Absolutely no problem as far as I'm concerned always prime . But as above never Tile directly to ply as I have seen many failures over the years and lots of brown grout .Ok thanks Julian, i thought it was standard practice. If the suction rate is not controlled with cement render and plaster than you end up with a crumbly mess. I thought a longer cure gave a greater bond and strength, you know yourself if you get adhesive on your jumper it dries and crumbles away! Do you think it will matter that i primed the ply when i shouldnt have? ooops