am constant at the mo, just chucked one to dj tiling, hope he got it and me and ric are jointly fitting a floor and 3 small toilet floors in 2 weeks, if it wasnt for the forum id never have sent the work that way lol,
still got a few to hear back from but if had the strength id be tiling from 0700 till 2100 7 days a week
fife is mad at the minute with **** loads of new builds and other works, site work here crap but residential booming, fife is the new edinburgh lol
andy