started a rip out today on ahouse that had water damage,we estimated how bad it was going to be but couldnt beleive what we were met with:yikes::yikes:
took 2 off us from 8am to 7pm to get it all out,80 bags of waste in the end,the shower tray waste pipe was a glue fitting but hadnt been glued and the water was pouring out all over the joists which were lying on a dpm and this had been fitted 6 years prior:yikes:
5 joists turned to mush as soon as we lifted the floor only 1 was left intact,these were lying on a 6 inch bed of what can only be described as wet mud and old crisp packets,,,with a severe worm infestation as we were in there digging it out with spades :yikes: tiles looked ok on most walls until i removed and the plaster fell off the brick to waist height all round the room as well as it had been soaking up the water for so long,also in areas it was tile on tile wit plasterboard glued to the last row of tiles to finsih off the walls,,a complete shocker weve had to stop all work after gutting it till the insurance loss adjustor turns up to look at it tomorow:yikes:
took 2 off us from 8am to 7pm to get it all out,80 bags of waste in the end,the shower tray waste pipe was a glue fitting but hadnt been glued and the water was pouring out all over the joists which were lying on a dpm and this had been fitted 6 years prior:yikes:
5 joists turned to mush as soon as we lifted the floor only 1 was left intact,these were lying on a 6 inch bed of what can only be described as wet mud and old crisp packets,,,with a severe worm infestation as we were in there digging it out with spades :yikes: tiles looked ok on most walls until i removed and the plaster fell off the brick to waist height all round the room as well as it had been soaking up the water for so long,also in areas it was tile on tile wit plasterboard glued to the last row of tiles to finsih off the walls,,a complete shocker weve had to stop all work after gutting it till the insurance loss adjustor turns up to look at it tomorow:yikes: