I have put some new plasterboard up in the shower area and have a leg kit for the stone shower tray which is fitted and i levelled the tray and sorted the waste but not fixed to floor yet.
I have the bal tanking kit/bal single part flex/bal microflex grout/solid bed trowel.
This is where i need some advice with the correct method, there are some ceramic screw heads in the plasterboard,do these need filling if so what with,should i
(1) tank down past the tray and tape the corner
(2) silocone around the tray before fixing in place
(3) tile the area
(4) fit cubicle
(5) silocone corner and along the shower tray again and around cubicle
or should i fit a sealux trim and tank the walls/tile/fit cubicle/silocone corner and cubicle
please give me some advice guys mike
I have the bal tanking kit/bal single part flex/bal microflex grout/solid bed trowel.
This is where i need some advice with the correct method, there are some ceramic screw heads in the plasterboard,do these need filling if so what with,should i
(1) tank down past the tray and tape the corner
(2) silocone around the tray before fixing in place
(3) tile the area
(4) fit cubicle
(5) silocone corner and along the shower tray again and around cubicle
or should i fit a sealux trim and tank the walls/tile/fit cubicle/silocone corner and cubicle
please give me some advice guys mike