Would you consider this quality work?

Tilers Forums Official Sponsors

Just had the same problem on a anayldrite screed.
The front door was leaking for 2years since I laid the floors (over 100m2) about 2m2 became lose and grout cracked.
Me and the owner lifted tiles , tiles came away clean, I'd back buttered , back buttering was still on tile and addy on the floor.
Addy was dusty and damp.
Looking at your bifolds and outside , could water be penetrating under the sill ?
 
Hi Antonio,

I think it's Bs (British standards) in the U.K. I'm not sure if uni is the same?
then, I am informed.
UNI are Italian standards, written in collaboration with ASSOPOSA.
ASSOPOSA is like TTA English.
TTA and ASSOPOSA are members of the EUF, federation associations tile installers. therefore, it should be the same. there may be slight variations, for example in the laying out of wood, or on substrates anhydride, which here are almost nonexistent. I think
 
Just had the same problem on a anayldrite screed.
The front door was leaking for 2years since I laid the floors (over 100m2) about 2m2 became lose and grout cracked.
Me and the owner lifted tiles , tiles came away clean, I'd back buttered , back buttering was still on tile and addy on the floor.
Addy was dusty and damp.
Looking at your bifolds and outside , could water be penetrating under the sill ?

How has this gone ? did u check bifold ?
 

Advertisement

Thread Information

Title
Would you consider this quality work?
Prefix
N/A
Forum
Canada Tile Advice
Start date
Last reply date
Replies
85

Advertisement

UK Tiling Forum

Thread statistics

Created
Toni,
Last reply from
widler,
Replies
85
Views
22,645

Thread statistics

Created
Toni,
Last reply from
widler,
Replies
85
Views
22,645
Back