H
hillhead
I have been using my 365 kit again this week,porcelain and ceramic.Top class job again.
A plumber arrived to my job on tuesday !! me with loads still to do!(pressure or what) he had 3 others with him too:yikes:.Luckily they had plenty to do(new house) but by thursday they were fitting toilet,rads and basins,Me just grouting ahead in them areas and even tiling left to do around windows etc!! phew,got out by lunch time friday.
Anyway when the head plumber seen my holes for the chrome towel rail pipes he near choked !!:yikes: lol. Perfect and tight,tried to say he needed more space around them,15mm pipes(16mm drill bit),lol.i had em at correct distance apart and think thats why he was panicking.
A plumber arrived to my job on tuesday !! me with loads still to do!(pressure or what) he had 3 others with him too:yikes:.Luckily they had plenty to do(new house) but by thursday they were fitting toilet,rads and basins,Me just grouting ahead in them areas and even tiling left to do around windows etc!! phew,got out by lunch time friday.
Anyway when the head plumber seen my holes for the chrome towel rail pipes he near choked !!:yikes: lol. Perfect and tight,tried to say he needed more space around them,15mm pipes(16mm drill bit),lol.i had em at correct distance apart and think thats why he was panicking.
Last edited by a moderator: