I
Ian
I started a kitchen floor today and the lady of the house had sent me a text yesterday to say that the kitchen was empty and ready to go, great I thought. Turned up this morning (she'd gone to work) to be greeted by an empty kitchen apart from the washing machine, dish washer, fridge freezer and cooker :mad2::mad2: and I was on my own!!!! Anyhow got them moved, primed up and went out to the garage to inspect the tiles. B&Q cheapies but no problem, or so I thought. 15 m2 in 4 different batches and to top it off she told me that they were end of line and she'd bought them last August so well out of the 45 day return period!!!! I've basically had to treat the job as if it were uncalibrated slate and go through all the boxes sizing them and mixing the shades. Love this job sometimes :lol: