The biggest mistake here was NOT, heating the floor BEFORE tiling.
even with 6 weeks drying time, his time of year it would not have been dry.
was the screed tested for moisture??
i have made this now to dry our screeds if the boiler can't be commissioned in time for tiling. Can be connected to manifold.
![image.jpg image.jpg](https://www.tilersforums.com/data/attachments/31/31728-5b2743b2fb0f51e124ec4fc1dd79a422.jpg?hash=WydDsvsPUe)
![image.jpg image.jpg](https://www.tilersforums.com/data/attachments/31/31729-6fae951dd9f1ed02c02b74db87ffa14b.jpg?hash=b66VHdnx7Q)
even with 6 weeks drying time, his time of year it would not have been dry.
was the screed tested for moisture??
i have made this now to dry our screeds if the boiler can't be commissioned in time for tiling. Can be connected to manifold.