C
cjones
Hi all,
I recently had a request to give a quotation come through the post. The pack which i received contained a very detailed description ( 64 pages) of the work to be carried out . Now in a nut shell it's to supply all adhesive , tiles and trim and to fix 2848 m2 in four tower blocks.
The tiles are standard 150 x 150 whites.
Im wondering what is a competitive metre rate (labour only) to take on such a big job?
How much profit can be made on materials?
Bearing in mind all the tiles will have to be taken up the blocks and the residents are still living in them. So will have to clean up properly .
Thanks to anyone that can help in advance , cheers
I recently had a request to give a quotation come through the post. The pack which i received contained a very detailed description ( 64 pages) of the work to be carried out . Now in a nut shell it's to supply all adhesive , tiles and trim and to fix 2848 m2 in four tower blocks.
The tiles are standard 150 x 150 whites.
Im wondering what is a competitive metre rate (labour only) to take on such a big job?
How much profit can be made on materials?
Bearing in mind all the tiles will have to be taken up the blocks and the residents are still living in them. So will have to clean up properly .
Thanks to anyone that can help in advance , cheers