Hi all, looking for a little advice if possible.
I'm putting in a ground floor wetroom, the floor is an underfloor heated sand and cement screed with tile backer walls to 2 sides and Gypsum plaster set on the other. I have used the Bal WP1 kit to tank the shower area and entire floor of the room however, after following the kits instruction to the letter, I have found that despite trying to get the coating on as thickly as possible, that I have used a lot less than the 10 sqm of surface should have taken (4KG vs the 6-7KG on the BAL coverage guidance). I have also noticed that there are definitely thinner and thicker patches.
Should I recoat? If so when can I do this, after 24 hours?
Or should I just leave it as is, as the floor and lower walls seem to be well covered.
Cheers for any advice, wish I had found this forum before embarking on my current spec for this room, things I have read on here would have changed my approach.
Steve
I'm putting in a ground floor wetroom, the floor is an underfloor heated sand and cement screed with tile backer walls to 2 sides and Gypsum plaster set on the other. I have used the Bal WP1 kit to tank the shower area and entire floor of the room however, after following the kits instruction to the letter, I have found that despite trying to get the coating on as thickly as possible, that I have used a lot less than the 10 sqm of surface should have taken (4KG vs the 6-7KG on the BAL coverage guidance). I have also noticed that there are definitely thinner and thicker patches.
Should I recoat? If so when can I do this, after 24 hours?
Or should I just leave it as is, as the floor and lower walls seem to be well covered.
Cheers for any advice, wish I had found this forum before embarking on my current spec for this room, things I have read on here would have changed my approach.
Steve