End of second day on a new bathroom job

1.JPG

2.JPG

3.JPG

4.JPG

5.JPG

6.JPG

7.JPG

8.JPG

9.JPG

10.JPG

10a.JPG

11.JPG

12.JPG

13.JPG

14.JPG
 
LOL made sure it was bullet proof but..... in the unlikely event that access is needed, a fitted wardrobe in the spare bedroom backs on to the bath wall, and I will burrow my way in through there !!
 
Okay still got the doors to trim but final bit from me done IMG_0657.JPG
just sparky to sort lights
 
Last edited:
So started rip out in the ensuite today. Tiles didn't come off anywhere near as sweetly as in the bathroom (well not in shower area).

1.JPG

2.JPG

3.JPG

4.JPG

5.JPG

6.JPG

7.JPG

8.JPG

9.JPG

10.JPG

11.JPG
 
So today finally got the 2 bathroom doors trimmed and hung and fitted a couple of bits to the walls. (there's new things everyday that appear and need drilling and fixing 😡

In the ensuite I've been studding, spragging and making a start on the shower plumbing. Once pb is damaged on metal studding there's just no strength there and it's the only way to go in my opinion. Needed to borrow some room on the RH side for valve placement anyway and I'll nick it back off the LH side when I get that studded tomorrow.

The tray is a crappy foam/plastic one - I did tell them to get a stone resin. Old tray was on a huge riser kit but the fall to the waste is fine for a floor mount so they'll be happy with that.

IMG_0672.JPG IMG_0670.JPG IMG_0669.JPG IMG_0681.JPG IMG_0676.JPG IMG_0678.JPG IMG_0680.JPG
 
I work to a laser line Julian and make tiny adjustments to grout joints if necessary. Spacer in sideways ever so slightly narrows the joint and I usually use wedges if I need to add a little.
 

Advertisement