C
cbohaker
Hello, I have a question on my bathroom subway tile job. I am very nervous and this is my first time so I want to make sure I get it right. I am installing 6" subway tiles and have attached a picture of my question. There is a lip where my tub bench is but the top of the tile doesn't meet to the top of the bench. I have attached a 2nd picture that may give you a better idea of what my thoughts are. I will have a laser level on the top of the full row of tiles to start and then i have a cut piece on the bottom to give me that lift. In order for me to put in that cut piece I will need to fill the gap between the tub flange and the small cut of tiles with thin set.. is this okay to do? Any suggestions would be great!
Last edited by a moderator: