I must be doing something wrong. There is no way I could fix 21m2 of tiles in a day, unless it was something like a straight 5mx4m rectangle with no cuts! Do you have a helper or something?
Grumpy
no just myself m8, 21 m2 isnt a lot to
tile if you think about, if its just the bath/shower and probaly a window maybe a pipe box to, if you start at 8am and work til about 3 it should be done by then, i usualy get my lil cuzzin to help me with the grouting thats about it
edit: when you work for a company that give a **** rate per m2 you tend to become quicker at what you do.
all the older tradesman i learned with would do this quicker than me aswell