S
Spud
I have a job local to me where the customer was sold a calcium sulphate screed as a fast track floor solution fot their project, the screed was done back beginging of july and is still not dry enough to tile , I spent hundreds of pounds on moisture and humidity testing equipment and even have a gypsum based an anhydrite adhesive from tile master waitng to stick the tiles down, in some areas the humity of the floor is 93% the heating has been run to dry out the floor and the customers cant get their job finished due to using this type of flooring what a load of rubbish