D
doug boardley
been to follow up a car showroom enquiry from last year today.Customer is nearly ready for tiling. It has piped ufh embedded in concrete screed. To power the ufh he's going for a geo-thermal system but this won't be done till after tiling installation. I'm wondering if this is wise as a gradual warm up prior to tiling should detect any stresses etc. If I use ditra would this eliminate the need for a gradual warm up prior to tiling? Showroom is about 140m2
Cheers
Doug
Cheers
Doug