R
RockCeramics
Could do with some info if possible relating to concreting.
A contractor is reinstating a concrete slab infill of 40m long and a depth of 350mm before a screed bed for tiling.
they are insisting that the screed bed will be fixed in 24hrs after concreting??
Now i assumed that the concrete would need to set before tiling, 1 day per inch is this correct, or are we looking at a longer period (3 weeks?)
A contractor is reinstating a concrete slab infill of 40m long and a depth of 350mm before a screed bed for tiling.
they are insisting that the screed bed will be fixed in 24hrs after concreting??
Now i assumed that the concrete would need to set before tiling, 1 day per inch is this correct, or are we looking at a longer period (3 weeks?)