- 351
- 1,078
Ive a job to look at friday eve to tile in 600 polished porcs(15 m2) .My concern is that roughly half the floor is existing concrete screed layed on top of insulation board,and the other half is fresh(2 month) screed over insulation.Would a decoupling membrane and flexi addi suffice for any movement which will take place between the two screeds ?:smilewinkgrin: ta