J
J Sid
to much time down south John and you have a developed a sense of humour 😱
Ah I wrongly presumed your pipes were already fitted into pregrooved boards, like a polypipe type of system so the whole floor was already 16mm higher than the base, you need some sort of insulation under the pipes or you'll be wasting heat into the subfloor.. As it is it'd take a lot more than three of four bags of leveler, more like 10..
where are the pipes coming from? Please don't tell us from your radiator run
to much time down south John and you have a developed a sense of humour 😱