S

Spud

Just out of interest Gary how would you feel if you found out that on another forum or down the pub there was a couple of domestic bathroom bashers that had never met you and never seen your work and new nothing about you except the fact you did 75m2 in two days and they was basically saying you must be cutting corners or lieing about how much you had done.

I have just read this back and answered my own question I would feel sory for them. So I apologise for trying to make you see just how bloody rud you are as it is purely down to the ignarence of what is possible in the trade from a real tiler.[/QUOTE) not too worried about what other tilers say as all tilers are a bit on the bitchy side it starts as soon as you start to learn and walk into every pub and restaurant and critique the standard of the tiling .in Germany they have a tariff book everything is set out by time and motion studies ceramic floor tiling tiled and grouted is one sq metre per hour wall tiling 1.1 hours they have pretty much broken down all the items I wonder if Rainsco could publish the tariffs for us to have a look at then you could honestly say if you are faster or slower than tariff
 
T

TJ Smiler

in Germany they have a tariff book everything is set out by time and motion studies ceramic floor tiling tiled and grouted is one sq metre per hour wall tiling 1.1 hours they have pretty much broken down all the items I wonder if Rainsco could publish the tariffs for us to have a look at then you could honestly say if you are faster or slower than tariff[/QUOTE]

How interesting, look forward to reading more from Rainsco
 

peteablard

TF
Arms
692
1,058
Cheshire
I wasn't sure why this thread was started then did a bit of digging and found the other thread that sparked it and to be fair there were a few comments aimed at Ash that were uncalled for. I've fixed and grouted 60m2 in a shift single handed several times doing car showrooms. I've laid over 40m2 of ditra and tiled it in a day on my own. Why would any of us lie or exaggerate what we are capable of or what we've seen people do? I've also been part of a 3 man team that struggled to fix 10m2 between us in a day!! If everything goes well and you're the type of person who gets their head down and cracks on with it then it 30+ metres a day is easy in the right circumstances.
I've met Dean and I know he can argue with the best of them (No offence meant pal) However I genuinely believe this thread was started with the intention of proving a valid point and not to fall out with people.
 
P

Peter

Every job is so different with substrate flatness, tiles, checks etc its hard to have a consistent daily meterage. Took me 5 days to do a 30m bathroom lately due to lots of boxing reveals etc and 14 lengths or chrome trim. Straight walls and one window would have it done in 2 days. Could be done in a day on an open floor.
 
S

Saltire69

I cannot believe that this has escalated into such a bitchfest.
I suppose in a way i started this. I did have a motive and there IS and underlying reason behind my comments.
Ridiculed for Ash and (cant be bothered going looking for the post but.... ) his gaffer knocking out 38m, they werent. I dont think anyone was "ridiculed" in that post.
We all complain about builders, cowboys etc etc. Ash has been tiling for all of 5 minutes. Are we suggesting that he should be able to knock that sort of coverage out in a day? If he does then do we think that he has the experience to apply both speed and accuracy to his work? I would argue no. And thats not just because its Ash.

Its almost comical that the same people that would complain about course tilers are supporting "bash it out" attitude to someone that isnt even a course tiler. Its nothing short of ludicrous in my opinion. Care, finesse and attention to detail are all vitally important traits i feel in our industry. Traits that should take presidence over speed and profit.
Yes a tiler of some 30 years can probably get it done. I personally hate working when i feel rushed. Believe it or not i like my job and trade and this will continue to be the case all the while i apply my own attitude towards my work and continue to enjoy it.

So ill ask the question. 38sqm fixed in a day. Is this something that a tiler at apprentice level should be achieving? Or aiming towards? Is quantity at this level more important than quality?

On a personal level i wouldnt know if i could cover that floor in the same time frame Deano has. To be completely honest it doesnt look very complex in layout. Nothing too awkward to navigate. But id sooner not. I mean what would you charge then? £20psm? So were saying £700+ per day!? I couldnt justify that to a customer. Maybe speedy residential work like that might encourage cheaper pricing. We've all complained about that havent we? Couple cheap pricing and inexeperience together do we not get the other bug bear? Poor finish. Cowboy builders blah blah blah.

If you think about it in a way youre shooting yourselves in both feet.

If you can do it with experience then thats fannastic. Without complaint, awesome!
Setting the bar there for apprentice tilers is nothing short of industry destruction and stupid. IMO


Their paying Deano for his expertise, Whats the difference between another tiler charging the same but taking 3.5 days to do it. The client still pays the same.
 
M

m3fitter

yes, time that it takes is irrelevant, if... done correctly without fault,
one the otherhand, one of my tilers, asked for a job on price... foolishly I agreed, he tiled 17 on the wall on 6 on the floor, grouted in a bathroom in one day, from 7.30am - 10pm ! metro 300x100 halfbond wall, 600x300 rectified halfbond on floor... !
they wanted to go to bed ! the next day they looked at everything, picking up slightly recessed grout in places, mitred trim not meeting perfectly etc,etc....
if he had taken 2 days to complete, I am sure that they would not have snagged the work, as it was passable, not perfect, but passable and maybe just a quick re visit..
they stated ' working from 7.30 - 10pm, he must have been tired, why did he work this late '
so in essence, if you can tile large meterage and they are happy with the end result.. all good :) but if it looks a lot for one day, they will scrutinize
 
D

Dougs Third Go

okay, an analogy, my van needs fixing, say for instance drive shaft has gone, I ring round garages workshops etc to get a price/ quote, one of the first questions I ask is "how long will it take?" If I get 3 similar quotes monetary wise and the choice is ; a) 3 days, b) 2 days, c) 1 day.....all done to same spec, which quote am I gonna take?
 

widler

TF
Esteemed
Arms
2,334
1,328
England
nu5etahu.jpg

Im up glasgow a week on monday , gotta tile this,90m2 , bet it takes me more than a day !
" don't worry wid its flat as a pancake and bang on ready to go"

Head in hands and crying me eyes out .

Ps i totally agree about pricing, we are paid for our skills, if we wanted to get paid by the hour we would be stacking shelves .
It should not matter how fast we work as long as the works right, unfortunately how many have heard a customer say " christ i wish i was on your rate "
 
Tis true , we all know how much a solicitor charges add how much do mechanics charge?customers are paying for our experience and I have always found that they are glad when the job is done quickly and then they can have their house back and you out of the way good job well done thankyou
 
J

jonnyc

just been catching up with this thread and it seem to be moving towards a discussion about pricing a job and if fixed price ,might the client think too expensive if done very quickly.
For myself if i employ anyone to do work at my house i do get a few quotes and make my decision based not just on price but how they come across about doing job.i do probably work out in my head what chosen contractor may have earnt for the job but i have made my decision and i wont get stressed about it .
but it does bring up an interesting question which may have been debated before .
this being that i do not believe that a good tiler time served or not should ever give a day rate with the exception of taking up an old floor and not knowing how to make good till subfloor revealed before you can retile.
I will start a new thread as i dont want to hijack this one and expalin why i think this way>
 
Billy Duggan that brings back memories.
aye Phil the one and only billy duggan,boy did he give me a dogs life as they say,a nasty man he was,had me working all crazy hours weekends ,nights late nights ,you name it we had to do it,the thing is though he didnt used to ask,he would tell you that you was working,because he was a workaholic he thought all who worked for him should also be but there was only him making any money oh the tales i could tell about that person ( cant call him a man as he wasnt one,just a bully),but i learnt one hell of a lot from him i have to say
 
New posts

Reply to fast tiling in the Australia Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

Hi all, Will I be setting myself up to fail if I use the Dunlop CF-03 Flexible Fast Set Tile...
Replies
1
Views
2K
Hello, Just joined the forum and am hoping to get some advice on a project. I live in San...
Replies
2
Views
4K
    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you...
Replies
0
Views
3K
Hi all I’m so glad to have stumbled upon this forum, which seems to be a treasure trove of...
Replies
5
Views
3K
gamer1
G
Hi, We are in the process of having a new kitchen fitted and as part of the job we included...
Replies
5
Views
3K

Advertisement

Thread Information

Title
fast tiling
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
104

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 5 5.0%
  • Kerakoll

    Votes: 8 8.0%
  • Ardex

    Votes: 6 6.0%
  • Mapei

    Votes: 25 25.0%
  • Ultra Tile

    Votes: 14 14.0%
  • BAL

    Votes: 27 27.0%
  • Wedi

    Votes: 3 3.0%
  • Benfer

    Votes: 2 2.0%
  • Tilemaster

    Votes: 19 19.0%
  • Weber

    Votes: 18 18.0%
  • Other (any other brand not listed)

    Votes: 10 10.0%
  • Nicobond

    Votes: 5 5.0%
  • Norcros

    Votes: 3 3.0%
  • Kelmore

    Votes: 1 1.0%
Top