Quality not quantity comes first.........then the longer you have been doing it.....the faster you should get, but not so fast that your quality suffers. We all have had jobs where the substrate has been perfect, and you could almost throw the tiles and they land spot on.......but those jobs are few and far between.

The older we all get, the slower we become.

Why rush anything.
 
T

The D

Couldnt agree more Doug.


My issue Deano was that you were quoting "my" work ethics, replying to "my" posts and being openly proud of causing upset.


I now understand that the underlying issue WAS with others (I think). I never slated fast tiling, but added some tongue in cheek humour to lighten the atmosphere. Even this got flipped around to try to start an argument. I have now read through the entire "DIY bathroom" thread which created this monster. In there
Deano you are partial to "mocking" Ash about his speed, but he took it as a joke (which I assume you meant it to be).........





Sadly it is one of those threads which was clearly created to end this way. As @Bri said posting of this nature is tantamount to trolling and @AliGage thankyou for shedding some light on how this thread has come to be in existence....I think it may have been your "yeeeeeeah" comment that started it.


I love a good discussion as much as the next tiler, but WILL stand up for myself and others when directly targeted Deano. You stated how much you get the hump when slow tilers slate fast tilers yet you refuse to acknowledge that people take offence at you slating how slow they are. To me arrogance really is a repulsive character trait.


If you haven't got a sound basis for your argument, then don't enter into one. In order for any argument to be valid the conclusion must follow logically from the basis and it has to be a non-fallacious logical form.....the exact opposite of your approach.
The arroganc of people is why I started this thread. Why is it whenever someone mentions they tile x amount in x time people feel the need to say they may be slower but it is because the put more in to it than the one going faster than them ??
I have a valid point and I do not start something if I think I am wrong.
yes I have poked fun at ash and I have always told him the truth about what I think but it was not ash that was Bering questions was it. The tiler that ash is working for is doing a job on site and that is a lot different to domestic tiling. Ash said his gaffer did 33m2 in a day and the very next post was a negative post about back buttering then there was a post mor or less calling him a liar and a nother comment about getting hurt from the tiles as they are thrown down.
IMO it is theads like that one that are the bad ones on this forum there was no need for it and it was someone eylses tread.
 
S

Spud

so here is what I did yesterday and today , tiles were already on site the floor was scraped, hoovered , primed and ditra matted the day before , about 75m2 tiled by me and another lad all tiles were back spread and the floor was bedded out with adhesive where needed . started at 9 am finished at 4 the first day started at 8.30am and finished at 5pm this evening and also latexed a small 10m2 utility floor as well , nothing special we didnt rush just worked at a normal pace left the place clean and tidy and put all our waste in the skip. I know tilers like PJC has guys that knock out 60m2 plus a day on their own to a fair standard on shop floors and do this day in and day out
 

Attachments

  • 20140529_085518 (960x1280).jpg
    166.1 KB · Views: 54
  • 20140529_085521 (960x1280).jpg
    120.6 KB · Views: 50
  • 20140529_085528 (960x1280).jpg
    84.8 KB · Views: 54
  • 20140529_163459 (960x1280).jpg
    93.8 KB · Views: 57
  • 20140529_163544 (1280x960).jpg
    78.5 KB · Views: 55
  • 20140529_172054 (960x1280).jpg
    81.7 KB · Views: 56
  • 20140529_163511 (960x1280).jpg
    76.9 KB · Views: 47
T

TJ Smiler

Looks great mate, 2 days is bloody good. I really have to find someone to work with more often, i do 99% of jobs on my own and a floor like that would prob take me about 5 days 'odd'. Not so sure it's working out cost effective for me to keep doing it on my own, yeah i get a bigger lump of money but it is so much graft on your todd, all the washing, tidying, mixing etc takes up so much time. Trying to find a laborer is bloody difficult though.............

If you get anything you want a hand on mate gis a bell if your normal fellers aint available, i'm in Broxborne (hertford) so only down the 414.
 
S

Spud

Looks great mate, 2 days is bloody good. I really have to find someone to work with more often, i do 99% of jobs on my own and a floor like that would prob take me about 5 days 'odd'. Not so sure it's working out cost effective for me to keep doing it on my own, yeah i get a bigger lump of money but it is so much graft on your todd, all the washing, tidying, mixing etc takes up so much time. Trying to find a laborer is bloody difficult though.............

If you get anything you want a hand on mate gis a bell if your normal fellers aint available, i'm in Broxborne (hertford) so only down the 414.
PM sent
 
Spot-on,

I wish and hope that I'll get to the point where I can easily knock-out 20-30m a day.

The thing I don't get is how its possible to get every single tile fitted. Right upto the corners, doorways, last bits at the end of a run, and its all dry enough to walk on, kneel on to reach out to put the last cuts in??

I had to spread a 4m bathroom floor over 2 days at the weekend, it was impossible to get 2 cuts in, so it was either sit around for 2-3 hrs to wait for it to dry (on a Sunday aft), or pack-up and come back the next day..
 
J

jonnyc

Spot-on,

I wish and hope that I'll get to the point where I can easily knock-out 20-30m a day.

The thing I don't get is how its possible to get every single tile fitted. Right upto the corners, doorways, last bits at the end of a run, and its all dry enough to walk on, kneel on to reach out to put the last cuts in??

I had to spread a 4m bathroom floor over 2 days at the weekend, it was impossible to get 2 cuts in, so it was either sit around for 2-3 hrs to wait for it to dry (on a Sunday aft), or pack-up and come back the next day..
welltheres the thing martyn.
it all comes together with experience but certainly possible
 

Andy Allen

TF
Esteemed
Arms
18,290
1,318
Gloucester
Spot-on,

I wish and hope that I'll get to the point where I can easily knock-out 20-30m a day.

The thing I don't get is how its possible to get every single tile fitted. Right upto the corners, doorways, last bits at the end of a run, and its all dry enough to walk on, kneel on to reach out to put the last cuts in??

I had to spread a 4m bathroom floor over 2 days at the weekend, it was impossible to get 2 cuts in, so it was either sit around for 2-3 hrs to wait for it to dry (on a Sunday aft), or pack-up and come back the next day..

I dry cut it all first then stick them down starting with the ones you wont be able to reach..
 
T

TJ Smiler

Spot-on,

I wish and hope that I'll get to the point where I can easily knock-out 20-30m a day.

The thing I don't get is how its possible to get every single tile fitted. Right upto the corners, doorways, last bits at the end of a run, and its all dry enough to walk on, kneel on to reach out to put the last cuts in??

I had to spread a 4m bathroom floor over 2 days at the weekend, it was impossible to get 2 cuts in, so it was either sit around for 2-3 hrs to wait for it to dry (on a Sunday aft), or pack-up and come back the next day..


For me mate (and i aint near as fast as some of these fellers) i always try as best i can and heights etc permitting tile level so i'm gonna be tiling into corners etc i'll snap a few chalk lines and then work from the corners back to my last line and because i work to 'plumb' i already no what level i gotta keep my tiles at so the meet perfectly......... hope that makes sense?
 
T

The D

so here is what I did yesterday and today , tiles were already on site the floor was scraped, hoovered , primed and ditra matted the day before , about 75m2 tiled by me and another lad all tiles were back spread and the floor was bedded out with adhesive where needed . started at 9 am finished at 4 the first day started at 8.30am and finished at 5pm this evening and also latexed a small 10m2 utility floor as well , nothing special we didnt rush just worked at a normal pace left the place clean and tidy and put all our waste in the skip. I know tilers like PJC has guys that knock out 60m2 plus a day on their own to a fair standard on shop floors and do this day in and day out
that looks like a real good job m8 and done in quick time ;0)
 
T

The D

Just out of interest Gary how would you feel if you found out that on another forum or down the pub there was a couple of domestic bathroom bashers that had never met you and never seen your work and new nothing about you except the fact you did 75m2 in two days and they was basically saying you must be cutting corners or lieing about how much you had done.

I have just read this back and answered my own question I would feel sory for them. So I apologise for trying to make you see just how bloody rud you are as it is purely down to the ignarence of what is possible in the trade from a real tiler.
 
M

m3fitter

OK i was reading a thread and was quite surprised at the attitude of some of the members when it comes to tilers that can get the m2 done quick time. the comments came thick and fast "if it was done that quick it must have been done wrong as in not back skimmed or it must be rough or a lie". now I'm not one to start an argument and i know that fast does not automatically mean good. but it does not automatically mean bad. and i know it is hard for some to conceive that a tiler can fix more than five m2 per day without it being complete rubbish but believe it or not some of us can. and to be honest slow is no guarantee of quality either. i will post some pics tomorrow of a floor i did today 36m2 kitchen, dining room, broom cupboard, hall, cupboard under the stairs, and cloak room. on to a power floated floor using 600 by 300 Eagle polished porcelain.


but for now here is one from the other day not exactly high end but not minging either
View attachment 58889 View attachment 58890 View attachment 58891 View attachment 58892 View attachment 58893

Agree totally, arrrr but the next day... hmmmm its taken its toll !! lol
 
M

m3fitter

speed doesn't necessarily mean bad quality, I can tile 35 metres on my own on a good day, and sometimes only 12... the speed can reflect how good the substrate is... i'm finding that 800x800 porcs fly down, quicker than 600x600, yet 600x300 rectified halfbond is slowwwwww, or chamfered edge 300x300 old style floors really fly down, tiling on Anhydrate flies down...... Saturday morning tiling as a rule does not fly down ! lol
 

Reply to fast tiling in the Australia Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

Hi all, Will I be setting myself up to fail if I use the Dunlop CF-03 Flexible Fast Set Tile...
Replies
1
Views
2K
Hello, Just joined the forum and am hoping to get some advice on a project. I live in San...
Replies
2
Views
4K
    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you...
Replies
0
Views
3K
Hi all I’m so glad to have stumbled upon this forum, which seems to be a treasure trove of...
Replies
5
Views
3K
gamer1
G
Hi, We are in the process of having a new kitchen fitted and as part of the job we included...
Replies
5
Views
3K

Advertisement

Thread Information

Title
fast tiling
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
104

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 5 5.0%
  • Kerakoll

    Votes: 8 8.0%
  • Ardex

    Votes: 6 6.0%
  • Mapei

    Votes: 25 25.0%
  • Ultra Tile

    Votes: 14 14.0%
  • BAL

    Votes: 27 27.0%
  • Wedi

    Votes: 3 3.0%
  • Benfer

    Votes: 2 2.0%
  • Tilemaster

    Votes: 19 19.0%
  • Weber

    Votes: 18 18.0%
  • Other (any other brand not listed)

    Votes: 10 10.0%
  • Nicobond

    Votes: 5 5.0%
  • Norcros

    Votes: 3 3.0%
  • Kelmore

    Votes: 1 1.0%