Discuss Floor Tiles on a new concrete floor. in the Best Floor Tiles area at TilersForums.com.

Ajax123

TF
Esteemed
Arms
932
1,213
Lincolnshire
A six inch deep new concrete flor has NOT dried out in 4 months. 6 inches will take about 18 months to dry fully. You will need something to controll residual moisture e.g. Ditra matting or a liquid dpm.
 

Reply to Floor Tiles on a new concrete floor. in the Best Floor Tiles area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

  • Question
What would you Pro’s do? A new extension has electric UFH in the screed which has been brought...
Replies
0
Views
317
E
eZheat Tile Levelling Clips and Wedges Kit Key Features: ---eZheat simplifies and quickens the...
Replies
0
Views
37
E
I'm planning on tiling my porch, and the tiles and adhesive will take up around 13mm of height...
Replies
2
Views
875
    • Like
Hello, this is my first post here, but I have been doing some reading. I am going to be tiling...
Replies
7
Views
687
Hi all, I'm an enthusiastic DIY'er (first time poster) who has been slowly chipping away at an...
Replies
10
Views
987

Advertisement

Thread Information

Title
Floor Tiles on a new concrete floor.
Prefix
N/A
Forum
Best Floor Tiles
Start date
Last reply date
Replies
19

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.6%
  • Kerakoll

    Votes: 17 10.5%
  • Ardex

    Votes: 11 6.8%
  • Mapei

    Votes: 45 27.8%
  • Ultra Tile

    Votes: 21 13.0%
  • BAL

    Votes: 38 23.5%
  • Wedi

    Votes: 4 2.5%
  • Benfer

    Votes: 3 1.9%
  • Tilemaster

    Votes: 22 13.6%
  • Weber

    Votes: 19 11.7%
  • Other (any other brand not listed)

    Votes: 17 10.5%
  • Nicobond

    Votes: 8 4.9%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 3.1%
Top